| 2015 | S. Dowlatshahi, M. Karimi-Nasab, H. Bahrololum: A group decision-making approach for supplier selection in configuration design: A case study. In: International Journal of Advanced Manufacturing Technology, 2015, 1139-1154 |
|---|
| 2015 | M. Karimi-Nasab, M., Modarres, S.M., Seyedhoseini: A self-adaptive PSO for joint lot sizing and job shop scheduling with compressible process times. In: Applied Soft Computing, 2015, 137-147 |
|---|
| 2015 | O. Kheirandish, R. Tavakkoli-Moghaddam, M. Karimi-Nasab: An artificial bee colony algorithm for a two-stage hybrid flowshop scheduling problem with multilevel product structures and requirement operations. In: International Journal of Computer Integrated Manufacturing, 2015, 437-450 |
|---|
| 2015 | M. Karimi-Nasab, H.M. Wee: An inventory model with truncated exponential replenishment intervals and special sale offer. In: Journal of Manufacturing Systems, 2015, 246-250 |
|---|
| 2015 | M. Karimi-Nasab, M. Modarres: Lot sizing and job shop scheduling with compressible process times: A cut and branch approach. In: Computers & Industrial Engineering, 2015, 196-205 |
|---|
| 2013 | M. Karimi-Nasab, S. Dowlatshahi, H. Heidari: A multi-objective distribution-pricing model for multi-period price-sensitive demands. In: IEEE Transactions on Engineering Management, 2013, 640-654 |
|---|
| 2013 | M. Karimi-Nasab, I. Konstantaras: An inventory control model with stochastic review interval and special sale offer. In: European Journal of Operational Research, 2013, 81-87 |
|---|
| 2013 | M. Karimi-Nasab, K. Sabri-Laghaie: Developing approximate algorithms for EPQ problem with process compressibility and random error in production / inspection. In: International Journal of Production Research, 2013, 2388-2421 |
|---|
| 2013 | M. Karimi-Nasab, S.M. Seyedhoseini: Multi-level lot sizing and job shop scheduling with compressible process times: A cutting plane approach. In: European Journal of Operational Research, 2013, 598-616 |
|---|
| 2013 | M. Karimi-Nasab, S.M. Seyedhoseini, M. Modarres, M. Heidari: Multi-period lot sizing and job shop scheduling with compressible process times for multi-level product structures. In: International Journal of Production Research, 2013, 6229-6246 |
|---|
| 2012 | M. Karimi-Nasab, I. Konstantaras: A random search heuristic for a multiple-objective production planning. In: Computers & Industrial Engineering, 2012, 479-490 |
|---|
| 2012 | E. Noorollahi, M. Karimi-Nasab, M.B. Aryanezhad: An economic production quantity model with random yield subject to process compressibility. In: Mathematical and Computer Modelling, 2012, 80-96 |
|---|
| 2012 | M. Karimi-Nasab, S.M.T. Fatemi Ghomi: Multi-objective production scheduling with controllable processing times and sequence-dependent setups for deteriorating items. In: International Journal of Production Research, 2012, 7378-7400 |
|---|
| 2011 | M. Karimi-Nasab, M.B. Aryanezhad: A multi-objective production smoothing model with compressible operating times. In: Applied Mathematical Modelling, 2011, 3596-3610 |
|---|
| 2010 | M.B. Aryanezhad, H. Sahebi, M. Karimi-Nasab: A JIT discount inventory model for multi-stage supply chain. In: Kuwait Journal of Science and Engineering, 2010, 225-250 |
|---|